{"id":4470,"date":"2024-06-15T20:23:34","date_gmt":"2024-06-15T23:23:34","guid":{"rendered":"https:\/\/geplangerenciamento.com.br\/servicos\/project-design-and-development\/"},"modified":"2025-01-22T20:19:48","modified_gmt":"2025-01-22T23:19:48","slug":"project-design-and-development","status":"publish","type":"servicos","link":"https:\/\/geplangerenciamento.com.br\/en\/services\/project-design-and-development\/","title":{"rendered":"Project Design and Development"},"content":{"rendered":"\n<p>GEPLAN has its own methodology for designing and developing projects, based on strict coordination and management procedures. This methodology makes it possible to control the quality of the design process, establishing clear guidelines for project development and ensuring integration between the various disciplines involved. GEPLAN&#8217;s approach enables critical analysis and quality control during all phases of project design.  <\/p>\n\n<h3 class=\"wp-block-heading\">Work steps<\/h3>\n\n<p>GEPLAN&#8217;s project methodology includes the following stages:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Preliminary Study:<\/strong> First analysis and definition of the project&#8217;s basic parameters.<\/li>\n\n\n\n<li><strong>Preliminary design:<\/strong> Development of the first proposals and technical solutions.<\/li>\n\n\n\n<li><strong>Basic Project:<\/strong> Detailed elaboration of the solutions approved in the preliminary project.<\/li>\n\n\n\n<li><strong>Legal Project:<\/strong> Compliance of the project with legal and regulatory requirements.<\/li>\n\n\n\n<li><strong>Executive Project:<\/strong> Preparation of the final documents for the execution of the work.<\/li>\n<\/ul>\n\n<h3 class=\"wp-block-heading\">Subjects<\/h3>\n\n<p>GEPLAN&#8217;s technical project team is able to carry out the design, drafting and development stages of the following types of projects:<\/p>\n\n<p><strong>Surveys and studies:<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Topographical<\/li>\n\n\n\n<li>Geological and Geotechnical<\/li>\n<\/ul>\n\n<p><strong>Architectural:<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Visual Communication<\/li>\n\n\n\n<li>Environmental comfort<\/li>\n\n\n\n<li>Interiors<\/li>\n<\/ul>\n\n<p><strong>Foundations and Structures:<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Concrete Structures<\/li>\n\n\n\n<li>Metal Structures<\/li>\n<\/ul>\n\n<p><strong>Urbanization and Landscaping:<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Infrastructure:<\/li>\n\n\n\n<li>Earthworks<\/li>\n\n\n\n<li>Drainage<\/li>\n\n\n\n<li>Geometric<\/li>\n\n\n\n<li>Paving<\/li>\n\n\n\n<li>Current Works of Art<\/li>\n\n\n\n<li>Vertical and Horizontal Road Signs<\/li>\n<\/ul>\n\n<p><strong>Hydro-sanitary installations:<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Sanitary sewage<\/li>\n\n\n\n<li>Industrial sewage<\/li>\n\n\n\n<li>Cold water<\/li>\n\n\n\n<li>Hot Water<\/li>\n\n\n\n<li>Storm Drainage<\/li>\n\n\n\n<li>Rainwater<\/li>\n<\/ul>\n\n<p><strong>Fire prevention:<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Fire extinguishers<\/li>\n\n\n\n<li>Hydrant network<\/li>\n\n\n\n<li>Sprinkler network<\/li>\n<\/ul>\n\n<p><strong>Electrical\/Telephone Installations:<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Lighting<\/li>\n\n\n\n<li>Energy Distribution (High, Medium, Low Voltage)<\/li>\n\n\n\n<li>SPDA (System for Protection against Atmospheric Discharges)<\/li>\n\n\n\n<li>Logic Network<\/li>\n\n\n\n<li>Structured Cabling (Voice and Data Transmission)<\/li>\n<\/ul>\n\n<p><strong>Electronic Systems:<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Fire Alarm and Detection<\/li>\n\n\n\n<li>CCTV (Closed Circuit Television)<\/li>\n\n\n\n<li>Access Control<\/li>\n\n\n\n<li>Building automation<\/li>\n<\/ul>\n\n<p><strong>Industrial Utility Installations:<\/strong><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Industrial Water<\/li>\n\n\n\n<li>Ice water<\/li>\n\n\n\n<li>Compressed Air<\/li>\n\n\n\n<li>Steam<\/li>\n\n\n\n<li>Gases (Natural, Oxygen, Nitrogen, Helium)<\/li>\n\n\n\n<li>LPG (Liquefied Petroleum Gas)<\/li>\n\n\n\n<li>Fluids<\/li>\n<\/ul>\n\n<p><strong>Air conditioning and exhaust systems<\/strong><\/p>\n\n<p>Through this multidisciplinary approach, GEPLAN ensures that projects are carried out to a high standard of quality, efficiency and integration, meeting the specific needs of each client.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>GEPLAN has its own methodology for designing and developing projects, based on strict coordination and management procedures. This methodology makes it possible to control the quality of the design process, establishing clear guidelines for project development and ensuring integration between the various disciplines involved. GEPLAN&#8217;s approach enables critical analysis and quality control during all phases [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4271,"template":"","class_list":["post-4470","servicos","type-servicos","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/geplangerenciamento.com.br\/en\/wp-json\/wp\/v2\/servicos\/4470","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/geplangerenciamento.com.br\/en\/wp-json\/wp\/v2\/servicos"}],"about":[{"href":"https:\/\/geplangerenciamento.com.br\/en\/wp-json\/wp\/v2\/types\/servicos"}],"author":[{"embeddable":true,"href":"https:\/\/geplangerenciamento.com.br\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/geplangerenciamento.com.br\/en\/wp-json\/wp\/v2\/servicos\/4470\/revisions"}],"predecessor-version":[{"id":4471,"href":"https:\/\/geplangerenciamento.com.br\/en\/wp-json\/wp\/v2\/servicos\/4470\/revisions\/4471"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/geplangerenciamento.com.br\/en\/wp-json\/wp\/v2\/media\/4271"}],"wp:attachment":[{"href":"https:\/\/geplangerenciamento.com.br\/en\/wp-json\/wp\/v2\/media?parent=4470"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}